Kozloduy NPP, State Enterprise for Radioactive Waste “Semi-industrial Installation for Incineration of Radioactive waste”, Technical design, Technological part as a partner in Consortium EkoRAOPartners |
2007 |
Kozloduy NPP, Units 5 and 6 “Kozloduy NPP Units 5 and 6 Planed maintenance 2007”, Detailed design, part Safety Analyses Report for the installation of 5HG53÷5HG58, 5HG60÷5HG68 and 6HG60÷6HG as Subcontractor of Enemona |
2007 |
Kozloduy NPP, Units 5 and 6 “Kozloduy NPP – Indication of safety parameters”, Installation Design as Subcontractor |
2007 |
Kozloduy NPP, Units 5 and 6 “Preparation of design documentation for complex of technical devices for controlling safety systems” – supply, dismantling of old equipment, assembling and adjustment of new equipment. Company participates as a subcontractor of Radiy Ltd |
2008 to 2010 |
Kozloduy NPP, WSFSF Participation in the “Evaluation of the Rest life time of the equipment for transportation of Spent Nuclear Fuel (SNF) in Wet Spent Fuel Storage Facility (WSFSF)” , as Subcontractor of Atomtoploproek |
2007 |
Kozloduy NPP, WSFSF “Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility”, Technical design, Detailed design, Delivery, Assembling activities, Functional tests, Commissioning as Subcontractor of Interpriborservise |
2008 to 2010 |
Kozloduy NPP, WSFSF “Equipment of trailer for SNF transportation”, Detailed design, Delivery, Installation works, Functional tests and Commissioning |
2009 |
Kozloduy NPP, WSFSF “Installation of three lamellate heat exchangers completed with filters for heat removal system of pools for SNF storage”, Delivery, Installation works, Functional tests and Commissioning |
2009 |
Kozloduy NPP, Auxiliary Building 3 (AB-3) “Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)”, Technical design, Detailed design, Assembling activities, Functional tests, Commissioning as Subcontractor of Interpriborservise |
2008 to 2009 |
Belene NPP, Technical design Participation in expert groups for evaluation of the Technical design |
2007 to 2010 |
State Enterprise for Radioactive Waste „RAW - Novi Han” “Taking down, development and verification of the Main electrometer panel at the „RAW – Novi Han” site”, Detailed design |
2008 |
State Enterprise for Radioactive Waste „RAW - Novi Han” “Outside water-conduit fire-extinguishing installation at the „RAW – Novi Han” site”, Detailed design |
2008 |
State Enterprise for Radioactive Waste „RAW - Novi Han” “Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”, Detailed design, Assembling activities, Functional tests, Commissioning |
2008 to 2009 |
Sofia Research Reactor IRT 2000 at INRNE of the Bulgarian Academy of Sciences Development of „Installation schemes and bills of materials” to Terms of reference for execution of “Installation and commissioning of monitors for control of rare gases NGM 204L, gamma ray monitors GIM 204 and neutron measurement monitors NIM 201 |
2008 |
Sofia Research Reactor IRT 2000 at INRNE of the Bulgarian Academy of Sciences Safety Analyses Report (SAR) of Detailed Decommissioning Plan for IRT-2000 reactor partial dismantling and its reconstruction in reactor at low power, as Subcontractor of Institute of Energetic |
2008 to 2009 |
ONET Technologies Bulgaria “Design and safety assessment for licensing the construction L/ILW Radioactive Waste National Repository, Technical design and preparation of Tender documentation |
2009 to 2010 |
GNS Gesellschaft für Nuklear-Service mbH Logistics and installation of equipment in WSFSF, Kozloduy NPP |
2009 |
GNS Gesellschaft für Nuklear-Service mbH PMC representative to support site management at KNPP site |
2010 |
ONET Technologies Nuclear International (former ONET Technologies Grands Projects) Site investigation for implementation of testing loop and processing of solidified phase of ECT in AB1 and AB2. |
2011 |
ONET Technologies Nuclear International (former ONET Technologies Grands Projects) Site investigation for implementation of testing loop and processing of solidified phase of ECT in AB1 and AB2. |
2011 |
ONET Technologies Nuclear International (former ONET Technologies Grands Projects) Feed back note based on Russian feedback and experience in relation to KNPP ECT Project (9b) |
2011 |
ONET Technologies Nuclear International (former ONET Technologies Grands Projects Validation and optimization of ARCADIA Conceptual design of ECT tanks treatment |
2011 |
ARCADIA INGENIERE Conceptual design for project for retrieval and processing of solidified phase of evaporated concentrate from ECT at "Kozloduy" Nuclear Power Plant - phase 2 |
2012 |
ONET Technologies Bulgaria Modification 1 and 2 of “Preindustrial installation for retrieval and treatment of evaporated concentrate”. |
2012 |
ONET Technologies Bulgaria Technical design for tender solution of project ECT phase 2, NPP “Kozloduy” |
2012 |
ONET Technologies Bulgaria Adaptation of ALGETA project in relation with ECT phase 2, NPP “Kozloduy” |
2012 |
ONET Technologies Bulgaria Project 9 b Retrieval and processing of evaporated concentrate from ECT phase 2 NPP “Kozloduy”
|
2011 to 2013 |
ONET Technologies Bulgaria Project 12 a Size Reduction and Decontamination Work shop
|
2012 to 2013 |
ONET Technologies Bulgaria Preparation and realization of Filters qualification in relation with project “Preindustrial installation for retrieval and treatment of evaporated concentrate” |
2013 |
SERAW Delivery of different types of containers for transport and storage of materials resulting from dismantling works and related services-stage 1 for KNPP units 1-4” |
2014 to 2015 |