Experience in Nuclear AREA

Kozloduy NPP, State Enterprise for Radioactive Waste
“Semi-industrial Installation for Incineration of Radioactive waste”, Technical design, Technological part as a partner in Consortium EkoRAOPartners
2007
Kozloduy NPP, Units 5 and 6
“Kozloduy NPP Units 5 and 6 Planed maintenance 2007”, Detailed design, part Safety Analyses Report for the installation of 5HG53÷5HG58, 5HG60÷5HG68 and 6HG60÷6HG as Subcontractor of Enemona

2007

Kozloduy NPP, Units 5 and 6
“Kozloduy NPP – Indication of safety parameters”, Installation Design as Subcontractor
2007
Kozloduy NPP, Units 5 and 6
“Preparation of design documentation for complex of technical devices for controlling safety systems” – supply, dismantling of old equipment, assembling and adjustment of new equipment. Company participates as a subcontractor of Radiy Ltd
2008 to 2010
Kozloduy NPP, WSFSF
Participation in the “Evaluation of the Rest life time of the equipment for transportation of Spent Nuclear Fuel (SNF) in Wet Spent Fuel Storage Facility (WSFSF)” , as Subcontractor of Atomtoploproek
2007
Kozloduy NPP, WSFSF
“Replacement of the existing bridge crane 16 t capacity in Wet Spent Fuel Storage Facility”, Technical design, Detailed design, Delivery, Assembling activities, Functional tests, Commissioning as Subcontractor of Interpriborservise
2008 to 2010
Kozloduy NPP, WSFSF
“Equipment of trailer for SNF transportation”, Detailed design, Delivery, Installation works, Functional tests and Commissioning
2009
Kozloduy NPP, WSFSF
“Installation of three lamellate heat exchangers completed with filters for heat removal system of pools for SNF storage”, Delivery, Installation works, Functional tests and Commissioning
2009
Kozloduy NPP, Auxiliary Building 3 (AB-3)
“Reconstruction and modernization of the control system of bridge electrical cranes 80-16-25-ЗК-УЗ (0UQ04E22, 0UQ01E04)”, Technical design, Detailed design, Assembling activities, Functional tests, Commissioning as Subcontractor of Interpriborservise
2008
to
2009
Belene NPP, Technical design
Participation in expert groups for evaluation of the Technical design
2007
to
2010
State Enterprise for Radioactive Waste „RAW - Novi Han”
“Taking down, development and verification of the Main electrometer panel at the „RAW – Novi Han” site”, Detailed design
2008
State Enterprise for Radioactive Waste „RAW - Novi Han”
“Outside water-conduit fire-extinguishing installation at the „RAW – Novi Han” site”, Detailed design
2008
State Enterprise for Radioactive Waste „RAW - Novi Han”
“Construction of 5 t crane for the Hot cell at „RAW – Novi Han” site”, Detailed design, Assembling activities, Functional tests, Commissioning
2008 to 2009
Sofia Research Reactor IRT 2000 at INRNE of the Bulgarian Academy of Sciences
Development of „Installation schemes and bills of materials” to Terms of reference for execution of “Installation and commissioning of monitors for control of rare gases NGM 204L, gamma ray monitors GIM 204 and neutron measurement monitors NIM 201
2008
Sofia Research Reactor IRT 2000 at INRNE of the Bulgarian Academy of Sciences
Safety Analyses Report (SAR) of Detailed Decommissioning Plan for IRT-2000 reactor partial dismantling and its reconstruction in reactor at low power, as Subcontractor of Institute of Energetic
2008 to 2009
ONET Technologies Bulgaria
“Design and safety assessment for licensing the construction L/ILW Radioactive Waste National Repository, Technical design and preparation of Tender documentation
2009 to 2010
GNS Gesellschaft für Nuklear-Service mbH
Logistics and installation of equipment in WSFSF, Kozloduy NPP
2009
GNS Gesellschaft für Nuklear-Service mbH
PMC representative to support site management at KNPP site
2010
ONET Technologies Nuclear International (former ONET Technologies Grands Projects)
Site investigation for implementation of testing loop and processing of solidified phase of ECT in AB1 and AB2.
2011
ONET Technologies Nuclear International (former ONET Technologies Grands Projects)
Site investigation for implementation of testing loop and processing of solidified phase of ECT in AB1 and AB2.
2011
ONET Technologies Nuclear International (former ONET Technologies Grands Projects)
Feed back note based on Russian feedback and experience in relation to KNPP ECT Project (9b)
2011
ONET Technologies Nuclear International (former ONET Technologies Grands Projects
Validation and optimization of ARCADIA Conceptual design of ECT tanks treatment
2011
ARCADIA INGENIERE
Conceptual design for project for retrieval and processing of solidified phase of evaporated concentrate from ECT at "Kozloduy" Nuclear Power Plant - phase 2
2012
ONET Technologies Bulgaria
Modification 1 and 2 of “Preindustrial installation for retrieval and treatment of evaporated concentrate”.
2012
ONET Technologies Bulgaria
Technical design for tender solution of project ECT phase 2, NPP “Kozloduy”
2012
ONET Technologies Bulgaria
Adaptation of ALGETA project in relation with ECT phase 2, NPP “Kozloduy”
2012
ONET Technologies Bulgaria
Project 9 b Retrieval and processing of evaporated concentrate from ECT phase 2 NPP “Kozloduy”
  • Technical and Detail design Lot 1 - Retrieval equipment
  • Technical and Detail design Lot 2 - Waste preparation
  • Technical and Detail design of Lot 2 BIS – Condenser
  • Technical and Detail design of Lot 3 – Waste separation
  • Technical design of Lot 6 – I&C
  • Technical and Detail design of Lot 7- Conveyor cooling
  • Technical and Detail design of Lot 8 – Borate container
  • Executive studies of Lots 2-7-8 and 1-3-6
2011
to 2013

ONET Technologies Bulgaria

Project 12 a Size Reduction and Decontamination Work shop 

  • Technical and Detail design of Thermal cutting cabin
  • Technical and Detail design of Lot 3 - Chemical decontamination
2012 to 2013
ONET Technologies Bulgaria
Preparation and realization of Filters qualification in relation with project “Preindustrial installation for retrieval and treatment of evaporated concentrate”
2013
SERAW
Delivery of different types of containers for transport and storage of materials resulting from dismantling works and related services-stage 1 for KNPP units 1-4”
2014 to 2015